View Scheduled Report Run History

Follow

Each scheduled report can show a history of results (up to 10 results per report) which details the date/time, report format, whether it was printed, E-mailed or saved as well as the run result.

The Scheduled Reports Feature is available in Release Build: 24.202 DB5531

  1. Click the navigation menu > Management > Reports page

  2. Operations menu > Schedule Reports

  3. Select the relevant report > Click View History

    1. The results are shown in the Run Result column

    2. Click EXIT

Article Link: A summary of links to Scheduled Reports articles

0 out of 0 found this helpful

Comments

0 comments

Article is closed for comments.