Manually Run an Automated / Scheduled Report

Follow

Rather than wait for the automated schedule to run the report, users can manually run a scheduled report. The report will be saved/e-mailed/printed based on the settings selected when the report was initially setup.

The Scheduled Reports Feature is available in Release Build: 24.202 DB5531

  1. Click the navigation menu > Management > Reports page

  2. Operations menu > Schedule Reports

    1. Select the relevant report > Click RUN RPORT

Article Links: A summary of Scheduled Reports articles

0 out of 0 found this helpful

Comments

0 comments

Article is closed for comments.