Once a report has been scheduled to run automatically, the settings can be edited.
-
Click the navigation menu > Location Management > Reports page
-
Operations toolbar > Schedule Reports
-
Against the relevant report, click the Edit button
-
-
Move through the steps to reach the section that should be edited, settings will not be saved until all steps have been moved through until Finish is selected
Article Link: A summary of links to Scheduled Reports articles
Comments
Article is closed for comments.